{"id":"measurements","title":"Measurements","description":"Every number the corpus commits to, with unit, year, scope and the scenario or observation it comes from.","license":"CC BY 4.0 for original Airform Agent Commons text and tables; third-party sources retain their own terms.","updatedAt":"2026-09-07T12:00:00.000Z","count":7,"fields":[{"name":"record","type":"string","description":"Record id"},{"name":"title","type":"string","description":"Record title"},{"name":"value","type":"number","description":"The number"},{"name":"unit","type":"string","description":"Unit"},{"name":"year","type":"number","description":"Year the value applies to"},{"name":"scope","type":"string","description":"Population or system"},{"name":"scenario","type":"string","description":"Scenario, estimate or observation basis"},{"name":"evidence","type":"string","description":"Evidential status"},{"name":"source_url","type":"url","description":"First citation"},{"name":"url","type":"url","description":"Canonical page"}],"rows":[{"record":"storage-as-byproduct","title":"A hundred gigawatt-hours of storage, acquired for free","value":100,"unit":"GWh","year":2035,"scope":"Twenty million Airform nodes at 10 kWh each, United States","scenario":"Airform deployment projection, August 2026","evidence":"hypothesis","source_url":"https://www.airformdata.com","url":"https://www.airformdata.com/commons/storage-as-byproduct"},{"record":"queue-capacity","title":"Capacity waiting in the US interconnection queue","value":2060,"unit":"GW","year":2023,"scope":"United States generation and storage in interconnection queues","scenario":"As cited in the Airform Introduction; reconcile with the current LBNL edition","evidence":"sourced","source_url":"https://www.airformdata.com","url":"https://www.airformdata.com/commons/queue-capacity"},{"record":"data-centre-demand-2030","title":"Global data-centre demand: a 2030 scenario","value":945,"unit":"TWh/year","year":2030,"scope":"Global data centres; all workloads","scenario":"IEA 2025 Base Case projection","evidence":"sourced","source_url":"https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai","url":"https://www.airformdata.com/commons/data-centre-demand-2030"},{"record":"data-centre-demand-2024","title":"Global data-centre electricity use: 2024 estimate","value":415,"unit":"TWh/year","year":2024,"scope":"Global data centres; all workloads","scenario":"IEA 2025 historical estimate","evidence":"sourced","source_url":"https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai","url":"https://www.airformdata.com/commons/data-centre-demand-2024"},{"record":"switchgear-deletion","title":"Onboard batteries delete a class of commercial switchgear","value":180000,"unit":"USD per building","year":2026,"scope":"Mid-size commercial building, avoided switchgear","scenario":"Airform-reported observation, August 2026","evidence":"observation","source_url":"https://www.airformdata.com","url":"https://www.airformdata.com/commons/switchgear-deletion"},{"record":"open-orders","title":"Open commercial orders before the first salesperson","value":17.3,"unit":"USD million, open orders","year":2026,"scope":"Airform commercial order book","scenario":"Airform-reported, August 2026","evidence":"observation","source_url":"https://www.airformdata.com","url":"https://www.airformdata.com/commons/open-orders"},{"record":"self-install-savings","title":"Self-installation saves a developer about ten thousand dollars a unit","value":10000,"unit":"USD per unit","year":2026,"scope":"Developer savings on early Airform commercial installations","scenario":"Airform-reported observation, August 2026","evidence":"observation","source_url":"https://www.airformdata.com","url":"https://www.airformdata.com/commons/self-install-savings"}]}