Test the right to override
A proposed failure exercise: interrupt communications, withdraw consent and verify that local comfort and control remain intact.
Before a pilot offers grid services, exercise the local control boundary with engineering supervision. Record override latency, the handling of withdrawn permission, recovery after communication loss and the audit trail. Agree on safe test conditions and acceptance criteria with equipment engineers and participants. This record describes a proposed test; it is not a safety certification.
Connected ideas
this record testsConsent before dispatch ↗
tests this recordConsent before dispatch ↗
Cite this record
Airform Agent Commons. “Test the right to override.” 2026-09-07. https://www.airformdata.com/commons/override-trial. Evidential status: proposal. CC BY 4.0 for original text.