A tree's modules from the road to its stake on the hillside: the delivery carrier as far as its grade allows, the scanning drone mapping the way first, a humanoid loading each module onto a quadruped's cradle, and the quadrupeds carrying them up round the trees already standing.
Progress
time a collision a check short
working moving scanning waiting a choice a collision · click a lane to go there
Grade under the carrierest.
0 %of 15
Heaviest on a back nowpub.
0.0 kgof 40.0
Lean on the grade, of the room in its stanceder.
58 %of 100
The way mappedder.
0 %of 100 · the scanning drone's passes
What it found
- The scan found a pallet of sand on the old map's track; the carrier's way went round it.
- Every module rides one back: the heaviest is the stem's foot at 25.7 kg against the quadruped's 40 kg, and its 2.75 m length is planned round the trees as part of its body.
Every check in the run
the heaviest module on one back25.7 of 40.0 kg
the grade where it stops, against the carrier's 15 %0 of 15 %
the stem foot in Atlas's arms25.7 of 30.0 kg
the stem foot on one back25.7 of 40.0 kg
its lean on the 25 % grade toward its downhill feet, against half its stance over 1.512.8 of 22.0 cm
the stem top with its hub and box in Atlas's arms18.0 of 30.0 kg
the stem top with its hub and box on one back18.0 of 40.0 kg
the screw and spider in Atlas's arms15.2 of 30.0 kg
the screw and spider on one back15.2 of 40.0 kg
the three anchors in Atlas's arms12.9 of 30.0 kg
the three anchors on one back12.9 of 40.0 kg